CPM Scheduling | Construction Expert

Project Cost Estimation

building, house, windows-414408.jpg

Construction Project Estimation

Repone offers several tiers of project estimation tailored to project needs and available documentation. This includes budgets taken from developmental or incomplete drawing sets, and lump-sum estimates from construction drawings.

 

Project estimation is as painstakingly detailed as our CPM schedules, which are in lockstep with the estimates. In scheduling jargon – Level 5 – or the highest level detail possible – from WBS to the activity level. Estimates can be used to develop scopes of work and work-packages for lockstep procurement programs. RepOne will complement any estimate with a project schedule upon request.

 

We are pleased to offer architectural project estimation in all specialty trades for the following types of projects:
 
  • Luxury residential and retail
  • Office & Commercial
Project Estimation is a collaborative efforts – done in concert with your team – such that your organization is involved and invested in the process and has input and feedback in every stage of project cost estimation. You set the project criteria, and we meet objectives together to produce the best possible estimates. 
 
RepOne’s CPM project scheduling modules can be bundled with project estimation to create data-driven project control to the most complex and large scale projects – from USD $1M to $4B. Cost and resource tracking options are also available for all estimation and scheduling product.

 

The process of project estimation begins with your criteria, or what your needs are. A documentation review will determine what level of detail and precision can be achieved. The design documentation is uploaded into a digitized platform, and area, linear, and unit count takeoffs are quantified.

 

As the takeoffs are generated, the data is highlighted graphically, and parsed into working spreadsheets that calculate totals and subtotals that can be checked and cross referenced.

Estimation Services

Square Foot Estimation

Order of Magnitude Estimation

Conceptual Estimation

Scope of Work / Line Item Estimation

Lump Sum and Cost + Estimates

Change Order Valuation

The above construction formats represent from least to highest level of exactitude predicated on the completeness and quality of design information conveyed in the drawings and specifications. Following a constructability analysis that includes reviewing drawings for clarity, RepOne will advise as to the best structure for your estimate.

Estimate Oversight and Change Valuation

In addition to preparing our own estimates, RepOne acts as oversight agent to third-party estimates and change orders – determining if valuations are correct, and if a proposed change order is valid or not. Ownership should never rely solely on a general contractor or construction manager for oversight – indeed, their work should be subject to third-party oversight, as a measure of keeping all parties honest

Archives: 2014 - 2024

Resource Loaded CPM Scheduling Strategies

Resource loaded CPM scheduling pertains to developing schedules based on activity durations predicated on production rates and constraints of available personnel or resources. Many project...

On the Adoption of AI Construction Scheduling Platforms

Recently, there have been some exciting developments in the field of AI construction scheduling platforms – such as the generative  “optioneering” platform offered by Alice Technologies*: the...

The Politics of CPM Scheduling

I think of politics in CPM scheduling primarily as an apt euphemism for sleight of hand reporting and representation of what contractors are either incapable of, or unwilling to give, accurate and...

Construction Disruption Claims & How to Optimize Them

In comparison to delay claims, construction disruption claims are a slippery slope when it comes time to make a claim. That’s because delays have finite start and end dates, where there is no work...

MEP Coordination Strategies

It’s been almost 10 years since I published my 4 part series on MEP coordination, and I thought “what better way to commemorate the occasion than with an update.” In that time a lot has changed and a...

CPM Schedule Oversight Best Strategies

CPM schedule oversight is a concern of both contractors and stakeholders.  Contractors should know what to expect from oversight consultants when they submit their schedules for approval. It...

CPM Schedule Specifications & Requirements: are they a waste of paper?

CPM Schedule Specifications & Requirements are generally found in CSI division 01 32 00 Construction Progress Documentation of a project manual or specifications, where they are routinely ignored...

Construction Completion Schedules for Accurate Closeout

  Nothing quite resembles the mad scramble contractors do to close out the final segments of their projects. By this time, the project schedule has likely been deprecated into a chaotic parallel...

Construction Bid Schedules: What They Are and Why Contractors Should Use Them

In requests for pricing (RFPs) or invitations for bids (ITBs) there are a number of requests or requirements that typically fall under the radar. One such is a seldom observed request generally known...