Construction Schedule Acceleration: Optimizing for Success
Schedule Acceleration: The Big Squeeze Construction schedule acceleration is a strategy designed and intended to either mitigate, or stanch off float erosion (delay), or to
Construction Defects
Schedule Delays & Disruption
Construction Accidents
Standard of Care
Product Defect
Breach of Contract
Schedule Acceleration: The Big Squeeze Construction schedule acceleration is a strategy designed and intended to either mitigate, or stanch off float erosion (delay), or to
There has always been a lot of confusion about what constitutes a âshop drawing,â submittal, Â and finally – coordination drawings. In order to optimize project
Retrofit construction layout is distinct from new construction in that new elements are dictated by existing program to remain or âETRâ – such as structure
Confusion and lack of consensus over what a construction project punch list or punch-out list is and what it isnât, contribute mightily to project conflict
Very few construction projects seem to progress without at least one general disruption or delay time impact that affects schedule milestones, and requires trades to
In most interior fit-out, builders only need to align major or basic elements – like walls, floors, and ceilings. As the sophistication of their commissions