Skip to content
construction expert NY
  • Home
  • Construction Expert
    • Construction Defects
    • Delay | Disruption | TIA | EOTs
    • Construction Accident Expert
  • CPM Scheduling Services
    • Oracle Primavera | Deltek Acumen Fuse Scheduling
  • Project Cost Estimation
  • Project Portfolio
  • Blog Posts
  • About
  • Contact
tel. 845 857 9674
tel. 845 857 9674
construction expert NY
  • Home
  • Construction Expert
    • Construction Defects
    • Delay | Disruption | TIA | EOTs
    • Construction Accident Expert
  • CPM Scheduling Services
    • Oracle Primavera | Deltek Acumen Fuse Scheduling
  • Project Cost Estimation
  • Project Portfolio
  • Blog Posts
  • About
  • Contact

Blog Posts: 2014 - 2024

stool, chair, triangular

Basic Architectural Millwork Scheduling

The Devil is in the Details Architectural millwork scheduling is a process describing several moving parts throughout the course of the project lifecycle, beginning with the design intent and design development through construction drawings, the submittal sample and mock up

Read More
CPM scheduling platforms

Choosing CPM Scheduling Platforms to Meet Your Needs

CPM Scheduling Platforms as Models of Efficacy Choosing CPM scheduling platforms is a matter of integrity and scale. You want to have the right tool box for the needs of your organization and the projects it manages. That means you

Read More
worker, subway construction site, construction

Generating Effective Construction Schedule Oversight Reports

Construction Schedule Oversight Success is Predicated on Having the Right Skill Sets There are both art and science at play in the business of preparing effective and productive CPM construction schedule oversight reports. That is to say, that technical knowhow

Read More
pexels-photo-28920745-28920745.jpg

Delay and Disruption Cases: a Tale of Two Claims

I recently had the pleasure of serving as an expert on two concurrent delay and disruption cases that proved to provide some interesting insights into the nuances of delay and disruptions experienced by the owner and the contractor. In one

Read More
schedule acceleration

Construction Schedule Acceleration: Optimizing for Success

Schedule Acceleration: The Big Squeeze Construction schedule acceleration is a strategy designed and intended to either mitigate and stanch off float erosion (delay,) or to recover lost time – so to better control or advance completion dates. There are a

Read More
shop drawing

Successful Shop Drawing and Submittal Strategies

There has always been a lot of confusion about what constitutes a ‘shop drawing,’ submittal,  and finally – coordination drawings. In order to optimize project management outcomes, it is necessary to not only know the difference, but to master the

Read More
productivity
11/06/2018 | By Derek Graham

Low Morale Drives Construction Negative Productivity

Construction negative productivity rates plague the building industry, as other industries enjoy modest growth. Industry leaders and academics struggle to come to terms with this reality, even as it continues to get worse. However, the focus causal factors tends to be simplistic, and predictable....

productivity loss
10/18/2018 | By Derek Graham

Representing Productivity Loss in Disruption Claims

The key to a successful productivity loss disruption claim is an accurate report and graphic representation of a meticulous Time Impact Analysis (TIA). In Primavera 6, the TIA may be represented with the baseline bar, and actual-bar, on the same chart. Another way of representing a...

blockchain
10/09/2018 | By Derek Graham

Construction Management Blockchain Project Delivery

International Union of Operating Engineers, 25,000BCE Not long ago, I posted a feature on AI-centric project delivery eventually supplanting traditional HI means and methods project of general requirements and general conditions, with semi-automated AI engines, assisted by human interfaces (HI). Blockchain project delivery will...

high end residential
10/02/2018 | By Derek Graham

High End Residential Defects and How to Avoid Them

Having the Right Stuff Fact: high end residential defects often don’t even pass lower standards of workmanship. To be sure, the more complex and sophisticated finishes, fixtures, and design programs, the higher the rate of defects in the installed works. That’s because the quality...

project failure
09/28/2018 | By Derek Graham

The Mechanics of Project Failure, or the “Why of Suck”

The overwhelming majority of construction project failure litigation pertains to homeowner complaints of defects and delay claims in the ‘home improvement sector.’ For the most part, those guilty are small-time contractors servicing projects below the radar. I.e., private homes, apartments, and other one-offs, in...

luxury residential
09/14/2018 | By Derek Graham

Luxury Residential High-Rise Fit-out CPM Schedule Sequencing

CPM schedulers depend on their resources and colleagues to help them plot the timeline of a luxury residential high-rise out of the ground mostly because they generally lack the on-hands experience to recreate the sequence of installations in a CPM timeline all by themselves....

fast-track
09/07/2018 | By Derek Graham

Fast-track and the Lost Art of CPM Schedule Acceleration

When we think of CPM Schedule Acceleration, no one waxes nostalgic when I mention the ill-fated fast-track project deliveries of the 1990’s. That’s because they rarely, if ever, panned out. They failed mostly for lack of proper coordination between design and construction, and created perpetual...

subcontractor schedule
06/20/2018 | By Derek Graham

Construction Subcontractor Schedule: Got Yours Validated?

Subcontractor schedule: the cost of avoidance ‘Subcontractor schedule’ isn’t a neologism, but fairly as rare To many tradespeople, a subcontractor schedule is a highly discretionary expenditure. They will mostly make the expense to comply with general requirements. These are done with gratuitous effort and little knowledge...

Pages

  • Project Portfolio
  • Construction Accident Expert
  • Construction Expert
  • Blog Posts
  • Site Map
  • Oracle Primavera | Deltek Acumen Fuse Scheduling
  • Construction Defects
  • Contact
  • Services
  • Home
  • Project Cost Estimation
  • Select Project Timelines
  • Delay | Disruption | TIA | EOTs
  • Oracle Primavera CPM Scheduling Services
  • About

Categories

  • Uncategorized
  • project management
  • project controls
  • Primavera
  • News
  • Market News
  • expert witness
  • Design
  • Deltek
  • cyber security
  • cpm scheduling
  • construction technology
  • Construction Management
  • Construction expert
  • construction estimation
  • construction claims
  • builder risk
  • BIM
  • Augmented Reality
  • AR
  • AI
  • agile
  • Acumen Fuse
construction expert NY

Contact

  • 32 West Street, 3S
    Cold Spring, NY 10516
  • +845 857 9674
  • Derek@RepOne.net

OPENING HOURS

  • Monday - Friday:
  • 9:00AM - 5:00PM