Construction Subcontractor Schedule: Got Yours Validated?

Subcontractor schedule: the cost of avoidance

‘Subcontractor schedule’ isn’t a neologism, but fairly as rare

To many tradespeople, a subcontractor schedule is a highly discretionary expenditure. They will mostly make the expense to comply with general requirements. These are done with gratuitous effort and little knowledge or care for critical path method. In this way are they wholly reliant on their scheduler’s ability – yet they just want the job done, without any details UON. Given the paucity of competent construction schedulers, the forecast is less than auspicious for a change of form for subcontractors. 

‘We’re all familiar with the phrase “flying by the seat of one’s pants.”

Despite the benefits to them, getting a subcontractor schedule can be like pulling teeth – which is part of the problem. Making onerous demands you know your vendors can’t meet isn’t the only way to get a schedule – there’s much more to the transaction than that, which general contractors and construction managers routinely seem to ignore, or reside in denial.

A subcontractor schedule is wholly distasteful to most specialty trades – i.e. 75% of the industry, and many don’t have anyone who can do it on their team. They ignore the requirement until they are pressured, after which they generate a rough timeline, complete with hard-dates and constraints. This document is given the GC or CM’s scheduler to fold into the master.

‘GC, CM, subcontractor, it’s not who you are, but how much you’re willing to risk, that dictates the integrity of the subcontractor schedule you design to do conduct business with

They will be hard pressed to convert or import a subcontractor schedule into the master, therefore, they manually parse the former into the latter. This they never do with more conviction than the schedule has integrity.

A scheduler with field experience is in the best position to analyse a subcontractors’ schedule, as he has familiarity with means and methods, and duration – the time it takes to do the work. Without this insight, the scheduler must take a leap of faith and hope his subcontractor schedule isn’t utterly feckless.

For myself, I like to rough out all of the scope of work for the trades that I can do on my own. I seek guidance from trades and vendors to fill holes. If they have shared a subcontractor schedule with me, I prefer to validate their schedules, and compare with my master schedule. When I see conflicts, and want more clarification, I then go through the schedule with the creator until I have gained satisfaction.

‘Best Practice Tip: foregoing a subcontractor schedule submission requirement virtually precludes any ability to bring a possible future compensable delay or disruption.

In this we often find that duration is too aggressive, or that the creator had no basis for them, engendering a discussion of acceleration scenarios, if any. This ambiguity is often perceived by the reviewer as a sign that the creator invested little effort or due diligence to the effort.

Remember you are doing the other contractual parties no favor by submitting a basic schedule, with an intact critical path. The more detailed, the easier it will be to chase down your TIA (Time impact analysis) initiative for your claim. Toward this effort, close tracking of productivity performance records must be maintained in order to substantiate a measured mile-based delay claim.

 

Archives: 2014 - 2024

Resource Loaded CPM Scheduling Strategies

Resource loaded CPM scheduling pertains to developing schedules based on activity durations predicated on production rates and constraints of available personnel or resources. Many project...

On the Adoption of AI Construction Scheduling Platforms

Recently, there have been some exciting developments in the field of AI construction scheduling platforms – such as the generative  “optioneering” platform offered by Alice Technologies*: the...

The Politics of CPM Scheduling

I think of politics in CPM scheduling primarily as an apt euphemism for sleight of hand reporting and representation of what contractors are either incapable of, or unwilling to give, accurate and...

Construction Disruption Claims & How to Optimize Them

In comparison to delay claims, construction disruption claims are a slippery slope when it comes time to make a claim. That’s because delays have finite start and end dates, where there is no work...

MEP Coordination Strategies

It’s been almost 10 years since I published my 4 part series on MEP coordination, and I thought “what better way to commemorate the occasion than with an update.” In that time a lot has changed and a...

CPM Schedule Oversight Best Strategies

CPM schedule oversight is a concern of both contractors and stakeholders.  Contractors should know what to expect from oversight consultants when they submit their schedules for approval. It...

CPM Schedule Specifications & Requirements: are they a waste of paper?

CPM Schedule Specifications & Requirements are generally found in CSI division 01 32 00 Construction Progress Documentation of a project manual or specifications, where they are routinely ignored...

Construction Completion Schedules for Accurate Closeout

  Nothing quite resembles the mad scramble contractors do to close out the final segments of their projects. By this time, the project schedule has likely been deprecated into a chaotic parallel...

Construction Bid Schedules: What They Are and Why Contractors Should Use Them

In requests for pricing (RFPs) or invitations for bids (ITBs) there are a number of requests or requirements that typically fall under the radar. One such is a seldom observed request generally known...