RepOne Consulting
CPM Scheduling | Construction Expert

Oracle Primavera CPM Scheduling Services

construction expert NY

CPM Scheduling Services

Preliminary Baselines

Revised Baselines

Updates & Narratives

Bid Schedules

Recovery & Mitigation

EOTs, TIAs, Claims

RepOne offers full project life-cycle CPM scheduling services to construction managers, general contractors, planners, design professionals, owners, and subcontractors, including baselines, progress updates, Time Impact Analysis, Recovery Schedules, and Claim Schedules.
 
CPM scheduling criteria can be developed independently, or as a collaborative effort with your team. Once this criteria is established, the project logic is developed through due diligence design documentation review, and team resource coordination. Having team input and consensus is central to making the most of your investment in  CPM scheduling both as a planning, forecasting, and forensic tool. 
 
CPM scheduling offers the key to accountability when conducting delay and disruption narratives. The ability to accurately trace project logic empowers teams with the ability to determine cause and effect, and to make changes on the fly without disrupting the integrity of project logic.
 
It helps to have a seasoned industry veteran provide CPM scheduling services – one who has extensive field experience in diverse building sectors, including megaprojects and infrastructure, major medical, higher-education, light rail and transit, luxury residential and retail, commercial, and processing plants.
 
Such experience is what separates the practitioners from the theoreticians: the former has ‘been there and done that’ with his own two hands, whereas the latter can only approximate what it takes to prosecute given scopes of work. The most skilled scheduler has both vast hands-on industry experience, as well as expert level skills with scheduling platforms. That’s what RepOne brings to the table – the best scheduler for the job.

 

P6 Baselines, Updates & Narratives

RepOne offers full project life-cycle CPM scheduling services to construction managers, general contractors, planners, design professionals, owners, and subcontractors, including baselines, progress updates, Time Impact Analysis, Recovery Schedules, and Claim Schedules. CPM scheduling criteria can be developed independently, or as a collaborative effort with your team.

Once this criteria is established, the project logic is developed through due diligence design documentation review, and team resource coordination. Having team input and consensus is central to making the most of your investment in  CPM scheduling both as a planning, forecasting, and forensic tool.

CPM baseline scheduling is the central nervous system for development of primary planning and project logic. It represents that to which all subsequent progress will be measured – including the basis for Time Impact Analysis, delay and disruption claims, and recovery schedules. It determines when resources, material, and equipment will be needed, and the order in which they must be prosecuted.

RepOne develops full-scope Level V Oracle Primavera CPM scheduling networks that represent the highest possible level of detail at the activity level. Highly developed WBS facilitate filtering that makes possible executive level roll-ups for the big picture, as well as individualized programs sorted by trade, area, floor, and resources.
 
Liquid flexibility in CPM scheduling is crucial to providing the ability to engage the project team to resequence work that has strayed from the baseline – a ubiquitous circumstance that is often ignored – much to the chagrin of project executives. A serviceable baseline allows big picture changes, as well as drill-down to the smallest details of resequencing, change order work, and project delays.
 
Resource loading of the baseline makes it possible to assign trades and personnel, and to detect over-allocation in the forward-pass, or look-ahead. RepOne offers a proprietary approach to resource loading that facilitates earned value analysis (EVA) studies that track work-in-place in real time.
 
RepOne is one of the rare CPM scheduling services that uses the Deltek Acumen Fuse platform to measure and validate project performance according to industry benchmarks, and which meet rigorous government standards. No other CPM scheduling platform performs this function in excess of the boilerplate DCMA 14 Defense Contract Management Agency, one of several metric assessment groups used by Acumen Fuse.  
 
Investment in the baseline is critical to the CPM scheduling effort. If the baseline is flawed, it will be difficult to use it as a point of reference for forecasting the forward-pass. A faulty or insufficiently detailed baseline will preclude the ability to make a solid delay or disruption claim schedule, should the time come, as they are subject to be predicated on false premises.

Third-party Schedules

Very few project schedules do not require at least one rebaselining as a consequence of scope creep or design changes. RepOne will also service your team’s schedule when it no longer serves its intended purpose, or when constant and dynamic changes demand higher integrity for use in tendering EOT claims. 
 
The sooner you position your schedule for reflecting impacts – the better. The longer you wait, the more complex and difficult this task will become. Don’t leave this critical exercise to a manager untrained in CPM – which is not the same as being able to create a basic schedule. 

Archives: 2014 - 2024

Resource Loaded CPM Scheduling Strategies

Resource loaded CPM scheduling pertains to developing schedules based on activity durations predicated on production rates and constraints of available personnel or resources. Many project...

On the Adoption of AI Construction Scheduling Platforms

Recently, there have been some exciting developments in the field of AI construction scheduling platforms – such as the generative  “optioneering” platform offered by Alice Technologies*: the...

The Politics of CPM Scheduling

I think of politics in CPM scheduling primarily as an apt euphemism for sleight of hand reporting and representation of what contractors are either incapable of, or unwilling to give, accurate and...

Construction Disruption Claims & How to Optimize Them

In comparison to delay claims, construction disruption claims are a slippery slope when it comes time to make a claim. That’s because delays have finite start and end dates, where there is no work...

MEP Coordination Strategies

It’s been almost 10 years since I published my 4 part series on MEP coordination, and I thought “what better way to commemorate the occasion than with an update.” In that time a lot has changed and a...

CPM Schedule Oversight Best Strategies

CPM schedule oversight is a concern of both contractors and stakeholders.  Contractors should know what to expect from oversight consultants when they submit their schedules for approval. It...

CPM Schedule Specifications & Requirements: are they a waste of paper?

CPM Schedule Specifications & Requirements are generally found in CSI division 01 32 00 Construction Progress Documentation of a project manual or specifications, where they are routinely ignored...

Construction Completion Schedules for Accurate Closeout

  Nothing quite resembles the mad scramble contractors do to close out the final segments of their projects. By this time, the project schedule has likely been deprecated into a chaotic parallel...

Construction Bid Schedules: What They Are and Why Contractors Should Use Them

In requests for pricing (RFPs) or invitations for bids (ITBs) there are a number of requests or requirements that typically fall under the radar. One such is a seldom observed request generally known...