The Relative Symbolism and Impermanence of Megaprojects: from Amarna to the Freedom Tower, a Series in 8 Parts

Megaprojects, or the $ billion+ equivalent

Nothing has the ability to inspire in equal measure passion or loathing than time immememorial immodest megaprojects. Whether conceived of necessity or vain extravagance, there seems to be no discussion possible without an abundance of superlatives – not all of them laudatory. Yet today’s megaprojects will be remembered more for the utter incompetence in their planning and execution, than for the finished (if ever) product.

At some point in the recent past, the biggest challenge to megaprojects shifted focus from the capacity to overcome engineering obstacles and work encumbrances, to the planning and administrative processes. In other words, it is seldom the case where builders can’t build: it is overly complicated bureaucracies and uncoordinated design efforts that prevent builders from doing so. The circumstance is ubiquitous. It creates an environment of adversity among the project team, and perpetuates a long tarnished record of losing propositions.

megaprojects

-it took a village, and then some. Note the water poured in the sand to make for smooth sailing.

Early megaproject controls could not have been as poorly served up and languid as they are now; else they never would have been built. So long as labor and materials were abundant, there was only a dictator, oligarch, council, or other point of control necessary to usher a project quickly through to shovel readiness, or what we call the preconstruction phase. For better or worse, they dispensed with the endless litanies of planners, designers, consultants, business agents, political activists, and cast of characters comprising today’s bloated bureaucracies.

A handful of major stakeholders controlled the process very closely, and allowed little room for the sort of administrative nonsense that pervades and debilitates today’s marvels. The chief distinction being that at least with the ancients, you know where the buck stopped: today, it’s impossible to say, as impunity seems to be built into the PR planning aspect of the project.

The critical evolution of the modern megaproject and its corollaries is translated to us through past works. Our challenge lies in the search for more objective historical and contextual perspectives, especially in non-extant works. The further back we look, the less (reliable) meaning we will discover, and become more reliant on anecdotal evidence. Regrettably, some of what has been long forgotten can only be stirred awake by inference. Such inference can be no less accurate than Herodotus’ recounting of Ancient Egypt,[ii] which is to say that it would be irresponsible to dismiss his works out of hand, as they provide at least some tenable facts.

My working definition of the characteristics of a modern day megaproject is

That enterprise which differentiates and transmogrifies any otherwise massive, but mundane or garden-variety undertaking, from one as being so disproportionate in scope, scale, and cost, as compared to extant and historical works, and so complicated and unnecessarily cumbersome in its prosecution, that failure becomes a banality before it is shovel-ready.

It would be difficult to distinguish megaprojects by context without apt historical comparisons of the culture or civilization in which they either flourished, or languished. In doing so, the first thing we discover is a relatively clean break from Old-World megaprojects: timeless, opulent, and humanistic – with New World megaprojects: soulless, decadent, hedonistic, unsustainable, and visibly lacking humanistic elements. Nor will their planning ever be described the same, since Shakespeare penned A Comedy of Errors, and more recently, a memorable Clint Eastwood one-liner from scene, in the movie Heartbreak Ridge. As we know too well, only time + budget seem to be the common denominator between early and present day megaprojects.

The Ancient Egyptian built brilliant and precociously innovative megaprojects that necessitated inventions in civil engineering, infrastructure, and the manufacture of stonework funerary complexes. In fact, upon inspection some of the level of expertise in their stonework challenges even today’s technology to reproduce. We can safely call the 5th Dynasty pyramids the worlds’ first great megaproject masterpieces. Surprisingly, the Egyptians weren’t the first megaproject builders: ruins in Goebetlitepe, Turkey, preceded them by six-millennia.

Goebetlitepe, Turkey

[i] deleted

[ii] Herodotus was a great story teller.

Archives: 2014 - 2024

Generating Effective Construction Schedule Oversight Reports

Construction Schedule Oversight Success is Predicated on Having the Right Skill Sets There are both art and science at play in the business of preparing effective and productive CPM construction...

Delay and Disruption Cases: a Tale of Two Claims

I recently had the pleasure of serving as an expert on two concurrent delay and disruption cases that proved to provide some interesting insights into the nuances of delay and disruptions experienced...

Construction Schedule Acceleration: Optimizing for Success

Schedule Acceleration: The Big Squeeze Construction schedule acceleration is a strategy designed and intended to either mitigate and stanch off float erosion (delay,) or to recover lost time –...

Successful Shop Drawing and Submittal Strategies

There has always been a lot of confusion about what constitutes a ‘shop drawing,’ submittal,  and finally – coordination drawings. In order to optimize project management outcomes, it is...

Mastering Retrofit Construction Layout: Optimizing Axes Lines and Benchmarks

Retrofit construction layout is distinct from new construction in that new elements are dictated by existing program to remain or ‘ETR’ – such as structure supporting walls, floors, and...

Punch List Techniques and Strategies for General Contractors 

Confusion and lack of consensus over what a construction project punch list or punch-out list is and what it isn’t, contribute mightily to project conflict in the close out stage of most any...

Managing Construction Contract Extension of Time Claims

Very few construction projects seem to progress without at least one general disruption or delay time impact that affects schedule milestones, and requires trades to accelerate in order to keep to...

Architectural Alignments in Construction

In most interior fit-out, builders only need to align major or basic elements – like walls, floors, and ceilings. As the sophistication of their commissions ratchet up, these architectural...

Resource Loaded CPM Scheduling Strategies

Resource loaded CPM scheduling pertains to developing schedules based on activity durations predicated on production rates and constraints of available personnel or resources. Many project...