Tag Archives: bim coordination

4D BIM CPM Scheduling is a waste of time: here’s why.

4D BIM CPM Scheduling: not ready for prime-time “The short answer is that there simply aren’t any extant Level III-IV 4D BIM risk-optimized or resource-loaded, apt CPM scheduling models with which to establish global parameters. 4D BIM CPM schedules can be generated from BIM models, but should they be? That...
Read more

10 AEC Professions AI Will Disrupt by 2027

AI Disruption Will Significantly Permeate the AEC Industries Historically, the construction and building industries tend to fall on the lower scale of tech-savvy, or digital-bandwidth, owing to a lack of skilled practitioners, and a paucity of training and investment in their constituency, but more so to a general disdain for...
Read more

BIM Adoption: Why it Has Failed to Mainstream, and May Never

BIM Adoption: is it as prevalent as ‘they’ say? I have written about BIM adoption in this space in 2014, dispelling bunkum that media spins about BIM adoption in the construction industry. In that same paper, I lampooned doctored surveys and questionnaires that purported to back up the survey findings....
Read more